2026 SDC Study
Prepared by Horrocks Engineers
2026 Master Plan Update
Prepared by Horrocks Engineers
Water Rate Model from Waterworth Presentation
Given by Daylen Perkins at the 10 October 2026 VVWD Board Meeting
2026 SDC Study Presentation
Given by Horrocks Engineers at the 10 October 2026 VVWD Board Meeting
2026 Master Plan Update Presentation
Given by Horrocks Engineers at the 10 October 2026 VVWD Board Meeting
Memo from the 6 October 2026 VVWD Board Meeting
Document outlining what the SDC is and questions that someone might have about this charge
This is the 1-page notice that was mailed out to stakeholders after VVWD Board Approval at the 6 October 2026 VVWD Board Meeting.
This is a more detailed notice that was approved by the VVWD Board at the 6 October 2026 VVWD Board Meeting.
To be presented to in the 17 November 2026 VVWD Board Meeting
This document is in Draft form with several places highlighted to be updated once comments are received and compiled.
This will be the actual BIS presented to in the 1 December 2026 VVWD Board Meeting and will be the 2026.11.17 Draft Updated to reflect comments.
LINK TO BE PROVIDED AFTER ALL PUBLIC COMMENTS AND BOARD DIRECTION IS RECEIVED AFTER 17 NOVEMBER 2026 VVWD BOARD MEETING
Text of the notices sent to the Review Journal for the Public Hearing Dates (17 November and 1 December 2026)
Copyright © 2025 Virgin Valley Water District - All Rights Reserved.
Powered by GoDaddy